SnowDriven Research

Support deadlines, verified at the source.

A free library of end-of-support dates for .NET, PHP, Windows Server and SQL Server, with guides and free data files. We maintain it ourselves: every date is checked against the vendor’s own lifecycle page and cross-checked with endoflife.date, and shows the day it was verified.

Dates
14
Still ahead
9
Verified
20 Oct 2026
Updated
21 Oct 2026
Access
Free, no sign-up

The next deadlines

The soonest dates still ahead, from the deadline table. Each links to its row, its source and what to move to.

  1. Ending soon

    Read the guide
  2. Ending soon

    Read the guide
  3. Ending soon

    Read the guide: .NET Framework 4.6.2 Read the guide: Windows Server 2016
  4. Upcoming

Recently ended: Windows Server 2012 (end of Extended Security Updates, 13 Oct 2026); Windows Server 2012 R2 (end of Extended Security Updates, 13 Oct 2026). All 14 dates

Deadline guides

What ends, how to check what you run, and the paths forward: .NET 8 and 9, PHP 8.2, .NET Framework 4.6.2 and Windows Server 2016.

  • Guide · Modern .NETEnding soon

    .NET 8 and 9 end of support: moving to .NET 10

    Microsoft support for .NET 8 and .NET 9 ends 10 November 2026. How to check what you run, the upgrade to .NET 10 LTS, what bites, and a five-week plan.

    Ends
    Updated
  • Guide · PHPEnding soon

    PHP 8.2 end of life: what to do before 2027

    PHP 8.2 security support ends 31 December 2026. How to check your version, and the upgrade path for WordPress and WooCommerce sites and custom PHP apps.

    Ends
    Updated
  • Guide · .NET FrameworkEnding soon

    .NET Framework 4.6.2 end of support: what to do

    Microsoft support for .NET Framework 4.6.2 ends 12 January 2027. Who is affected, how to check, and three options: 4.8.1, .NET 10 or replacing the app.

    Ends
    Updated
  • Guide · Windows ServerEnding soon

    Windows Server 2016 end of support: what to do

    Microsoft’s extended support for Windows Server 2016 ends 12 January 2027. How to check, the upgrade paths, Extended Security Updates and a dated plan.

    Ends
    Updated

Data and tools

The deadline table as files you can take with you, a daily WordPress tracker, two upgrade references (.NET and PHP), and two tools for a system of your own.

Tracked daily · WordPress and PHPEnd-of-life PHP on WordPress: daily trackerThe share of WordPress sites, among those reporting to WordPress.org, on a PHP version the PHP project no longer patches, and what PHP 8.2’s end on 31 Dec 2026 adds. Each version’s status, the daily series, and the data as JSON and CSV.See the latest figures

Teardowns

Published pages, measured on a stated day and read for what your own page can use.

Guides for AI adoption

Practical guides to bringing AI tools into a small company, with every product fact dated and linked to the vendor’s own page.

How it’s built

Verified at the source, dated, and corrected in the open. The full method is one page.

  1. 01

    Primary sources

    Every date comes from the vendor’s own lifecycle page: Microsoft Learn and the .NET support policy, and php.net.

  2. 02

    Cross-checked

    Each date is compared with endoflife.date. Where they disagree, the vendor’s page decides and we check again.

  3. 03

    Dated

    Every row shows the day it was last verified. We aim to re-check every row each week, and always in the week before a deadline; a date only moves when its source does.

  4. 04

    Corrected in the open

    Changes and corrections are logged with their date. Anyone can report a problem, no account needed.

Latest changes

  1. Reference: PHP 8.2 to 8.4, what breaks and how to tell
  2. Reference: .NET 8 to 10 breaking changes for web apps
  3. Guide: rolling out an AI assistant at a small company

About this page

Updated
Verified
7–20 Oct 2026

Cite this page

SnowDriven. “Support deadlines, verified at the source.” SnowDriven Research. https://snowdriven.com/research/ (last updated 21 October 2026).

One click or tap selects the whole citation, ready to copy.

About these dates

Each date is the vendor’s own, copied from its lifecycle page and checked on the day shown. Vendors can move dates without notice, and our copy can fall behind or contain mistakes, so confirm with the vendor before you rely on a date for a decision, contract or compliance deadline. Information only, provided as is (terms). Reuse: free to download and quote, with credit to SnowDriven and a link (terms of use).

Start a project

Something on this list still in production?

A modernization audit maps what you run, ranks the risks in plain language and plans the move in stages. Tell us what the system is; we’ll come back with questions or a time to talk.

Pittsburgh, PA · Since 2015 · First step: a 30-minute call